Datum Shift and Velocity Estimation , by Jon F. Claerbout

I derive an equation for a family of hyperbolas with various datums, each member of the family having a different asymptote velocity but the same rms velocity. Nonhyperbolic traveltime is readily mimicked by such datum-shifted hyperbolas. Datum adjustment was installed in the Overlay program. Dragging the mouse up and down changes the datum of the overlay hyperbola (after NMO it is a difference of two hyperbolas). Two of the Yilmaz field profiles gave datums of 120-220ms. An Alberta profile was found to be a textbook quality example.


« BACK

to SEP-51 index page

DOWNLOAD
pdf(419 KB)
ps.gz(590 KB)
STANFORD
EXPLORATION
PROJECT